The calculation logic and engineering-value
considerations for the anchorage depth of chemically planted rebar. There are
three core conclusions: First, the anchorage depth must be determined by taking
the larger value between the formula l_s = 0.2·α_spt·d·(f_y/f_bd) and the
minimum constructive depth, and must not be back-calculated from short-term
pull-out test values. Second, the final design value l_d must be obtained by
superimposing multiple correction factors including bearing capacity,
displacement ductility, and splitting, with particularly significant correction
magnitudes in seismic zones and for cantilever members. Third, load-bearing
structures and seismic zones must use Grade A adhesive; Grade B adhesive is
limited to non-structural members only.
I.
Code Basis and Scope of Application
Rebar-planting design involves multiple
current codes and specifications; execution should follow the current version
in force at the project location and the requirements of the competent
authority:
Technical Specification for Concrete
Structure Rebar Planting Systems, T/CECS 1847-2025
Technical Specification for Post-Installed
Fastenings in Concrete Structures, JGJ 145-2013
Design Code for Strengthening of Concrete
Structures, GB 50367-2013
General Code for Assessment and
Strengthening of Existing Buildings, GB 55021-2021
Among them, Clause 7.2.1 of JGJ 145-2013
imposes a mandatory provision on the use of rebar planting as the main
load-bearing connection for cantilever members and other principal force
connections. It is the higher-level constraint that determines 'whether rebar
planting may be used' and cannot be circumvented merely by increasing the
anchorage depth.
II.
How to Calculate the Anchorage Depth
2.1 Basic Anchorage Depth Formula
The basic anchorage depth of planted rebar
is calculated as follows:
l_s = 0.2 · α_spt · d · (f_y / f_bd)
The meaning of each symbol is as follows:
l_s: basic anchorage depth of planted rebar
(mm).
α_spt: concrete anti-splitting calculation
coefficient, dimensionless, determined by the rebar spacing and edge-distance
conditions.
d: nominal diameter of the rebar (mm).
f_y: design value of the rebar tensile
strength (N/mm2).
f_bd: design value of the bond strength
between the structural adhesive and concrete (N/mm2).
The formula shows that the anchorage depth
is directly proportional to the rebar diameter and rebar strength and inversely
proportional to the adhesive bond strength. For the same ribbed rebar, HRB500
(f_y = 435 N/mm2) requires about 1.25 times the anchorage depth of HRB400 (f_y
= 360 N/mm2); HPB300 plain round bars, with no ribs and poorer bond
performance, require the anchorage depth to be increased to 1.3-1.5 times that
of ribbed rebar, with a 180° hook at the end and a straight extension after the
bend of not less than 3d.
2.2 Minimum Constructive Anchorage Depth
The basic anchorage depth obtained from the
formula must also be taken as the larger value against the following
constructive minimums; both must be satisfied simultaneously to qualify:
Tensile rebar: max{0.3l_s, 10d, 100 mm} -
take the largest of the three.
Compressed rebar: max{0.6l_s, 10d, 100 mm}
- take the largest of the three.
Tie rebar: max{5d, 60 mm}, per T/CECS
1847-2025.
Cantilever members: multiply the
corresponding above values by a correction factor of 1.5.
It must be specially noted that cantilever
members must not use rebar planting as the main load-bearing connection. If it
is truly necessary, in addition to the 1.5 factor, a special demonstration is
required, and additional measures must be specified in the design documents.
2.3 Quick-Reference Comparison by Rebar
Grade
The table below gives the basic anchorage
depth (mm) by rebar grade under the formula for Grade A adhesive under normal
environment, applicable to ribbed rebar. The values are for quick on-site
estimation only; formal design shall be based on calculation.
|
Rebar grade
|
Common sizes (mm)
|
C20
|
C25
|
C30
|
C40
|
≥ C60
|
Strength value
|
|
HRB500
|
12-32
|
470-1253
|
400-1067
|
318-848
|
300-800
|
270-720
|
f_y=435
|
|
HRB400
|
8-32
|
250-1002
|
213-853
|
144-640
|
128-567
|
106-512
|
f_y=360
|
|
HRB335
|
12-32
|
281-750
|
240-640
|
191-508
|
180-480
|
162-432
|
f_y=300
|
|
HPB300
|
6-16
|
180-480
|
154-410
|
122-326
|
115-307
|
103-274
|
Plain round, 1.3-1.5×
|
In
the original draft, the large HRB400 table broken down
by spacing and edge distance (three groups: s1≥5d/c≥2.5d, s1≥6d/c≥3d,
s1≥7d/c≥3.5d) - their differences are all essentially reflected in the α_spt
value and have been merged into Section 2.4; the list is not repeated.
2.4 Correction Factors and Design Anchorage
Depth
The basic anchorage depth must be
multiplied by the various correction factors to obtain the final design
anchorage depth:
l_d = ψ_N × ψ_ae × l_s
The values and applicable conditions of the
three factors are as follows:
Bearing-capacity correction factor ψ_N: 1.0
for normal loading; 1.1-1.15 for general members; 1.15-1.27 for important
members; 1.5 for cantilever members; an additional 1.1 when rebar diameter
exceeds 25 mm.
Displacement-ductility correction factor
ψ_ae: for concrete strength not higher than C30, take 1.10 for 6-degree seismic
zones and 7-degree zones on Site Classes I and II, and 1.25 for 7-degree zones
on Site Classes III and IV and 8-degree zones; for concrete strength higher than
C30 and non-seismic zones, take 1.00.
Splitting-influence correction factor
α_spt: 1.0 when s1≥7d and c≥3.5d; 1.1 when s1≥6d and c≥3d; 1.25 when s1≥5d and
c≥2.5d.
By superimposing the above factors, the
comprehensive correction magnitude for common working conditions can be
estimated as follows, for quickly judging the required depth order of
magnitude:
Non-seismic, general members: 1.1-1.15
(most common).
7-degree seismic, general members (≤ C30,
Site Classes I, II): 1.21-1.27.
8-degree seismic, general members (≤ C30):
1.38-1.59 - note the relatively large depth.
Non-seismic, cantilever members: 1.65-1.9
(already includes the 1.5 cantilever factor).
8-degree seismic, cantilever members (≤
C30): 2.06-2.38 - rebar planting is not recommended.
III.
Adhesive Selection: Grade A vs. Grade B
Rebar planting in load-bearing structures
shall use Grade A adhesive and shall not use Grade B; Grade B adhesive may only
be used for anchoring non-structural members. The main differences between the
two types are as follows:
|
Performance indicator
|
Grade A adhesive
|
Grade B adhesive
|
|
Main component
|
Epoxy resin
|
Unsaturated polyester resin
|
|
Splitting tensile strength
|
≥ 8.5 MPa
|
≥ 6.0 MPa
|
|
Compressive strength
|
≥ 60 MPa
|
≥ 50 MPa
|
|
Steel-to-steel tensile shear strength
|
≥ 10 MPa
|
≥ 8 MPa
|
|
Aging resistance
|
Excellent (30+ years)
|
Fair (10-20 years)
|
|
Temperature resistance
|
Good (-40 to 80 ℃)
|
Fair (-20 to 60 ℃)
|
|
Scope of application
|
Load-bearing structures, seismic zones, important projects
|
Non-structural members, temporary facilities
|
Because Grade B adhesive has lower bond
strength, under the same conditions its anchorage depth needs to be about
15%-20% greater than Grade A. Taking HRB400, C30 concrete, s1≥6d, c≥3d as an
example: under Grade A adhesive, the l_s for Φ12 rebar is about 240 mm; after
switching to Grade B adhesive, the estimate is about 280-290 mm.
Selection by location can be judged as
follows: Grade A adhesive should be preferred for load-bearing or tension
members such as longitudinal reinforcement of construction columns, lintel and
ring-beam longitudinal reinforcement, and slab-bottom and beam-bottom
strengthening bars; Grade B adhesive may be restrictively used for secondary
structures and infill-wall tie bars where verified; Grade A adhesive must be
used for important projects such as bridges and water conservancy; Grade B
adhesive suffices for temporary facilities and non-structural members, and
using Grade A there is uneconomical.
IV.
Reference Anchorage Depth by Structural Location
The values below are common engineering
reference values, given for HRB400 rebar, Grade A adhesive, C30 concrete, and
non-seismic conditions. They are for quick on-site estimation only; formal
design must be based on structural calculation. Among them, main tension
members such as slab bottoms and beam bottoms must be further multiplied by the
corresponding correction factors.
|
Structural location
|
Common size
|
Recommended anchorage depth
|
Force characteristic
|
|
Infill-wall tie bar
|
Φ6, Φ8
|
≥ 180 mm
|
Constructive requirement; pull-out ≥ 6.0 kN
|
|
Construction-column longitudinal rebar
|
Φ12, Φ14
|
≥ 15d (180-210 mm)
|
Secondary structure, mainly compression
|
|
Lintel longitudinal rebar
|
Φ12, Φ14
|
≥ 15d (180-210 mm)
|
Bending; note tension side
|
|
Ring-beam longitudinal rebar
|
Φ12, Φ14
|
≥ 15d (180-210 mm)
|
Constructive requirement
|
|
Slab-bottom strengthening bar
|
Φ12-Φ16
|
≥ 18d-20d
|
In tension; multiply by correction factor
|
|
Beam-bottom strengthening longitudinal rebar
|
Φ16-Φ25
|
≥ 20d-22d
|
Mainly in tension; strictly by calculation
|
|
Column strengthening longitudinal rebar
|
Φ16-Φ25
|
≥ 18d-20d
|
Mainly compression
|
|
Cantilever-member longitudinal rebar
|
Φ14-Φ20
|
≥ 22d-25d
|
Multiply by 1.5; use with caution
|
|
Chemical anchor bolt M12-M20
|
M12-M20
|
≥ 120-160 mm
|
Per product manual; not less than 10d
|
V.
Additional Requirements for Seismic Fortification Zones
In seismic zones, the rebar-planting depth
is usually 10%-25% greater than in non-seismic zones; the exact magnitude is
determined by the seismic grade, and the following requirements must also be
met:
Material: Grade A planting adhesive must be
used; Grade B adhesive is strictly prohibited.
Concrete strength: the concrete strength
grade in the anchorage zone shall not be lower than C20; not lower than C25 for
important members.
Spacing and edge distance: in seismic
zones, rebar-planting spacing and edge distance should be appropriately
increased to avoid concrete splitting.
Failure mode: ensure the rebar-planting
failure mode is bar yielding followed by pull-out, not concrete splitting or
adhesive failure.
Grade correction: by seismic grade,
multiply by 1.15 for Grades I and II, by 1.05 for Grade III, and by 1.0 for
Grade IV.
VI.
Pull-out Tests and Bearing-Capacity Inspection
6.1 Test Types and Acceptance Criteria
On-site inspection is divided into
non-destructive and destructive types, with the following acceptance criteria:
Non-destructive inspection: the load value
is 0.9 times the standard value of the rebar yield bearing capacity; the load
drop within the 2-minute hold shall not exceed 5%, and the substrate shall have
no cracks and the rebar no slip.
Destructive inspection: load until failure;
the ultimate bearing capacity shall be no less than 1.2 times the design value.
Infill-wall tie bars: uniformly inspected
at 6.0 kN, per GB 50203.
Taking HRB400 rebar as an example, the
non-destructive inspection values and ultimate bearing-capacity reference
magnitudes are: Φ12 ≈ 40.7 kN / 55 kN, Φ16 ≈ 72.4 kN / 98 kN, Φ20 ≈ 113.1 kN /
153 kN, Φ25 ≈ 176.7 kN / 239 kN. The complete comparison can be checked item by
item based on the rebar cross-sectional area and yield strength.
6.2 Short-Term Pull-out Values Must Not
Determine Anchorage Depth
Passing a short-term pull-out test does not
equal long-term anchorage reliability. If the planting depth is insufficient
during construction, merely improving grout fill, etc., the short-term pull-out
test may still pass; but under the effect of time and repeated loads, the risk
of anchorage failure will gradually emerge. This is precisely why the code
emphasizes that 'anchorage depth shall not be determined from short-term
pull-out test values' - the depth must be determined by formula and correction
factors, and the pull-out test is only used to inspect construction quality.
VII.
Construction Quality Control
7.1 Drilling
The hole diameter should be controlled at
d+4-8 mm; the allowable depth deviation is 0-+20 mm (foundation), 0-+10 mm
(superstructure members), and 0-+5 mm (connection nodes); verticality shall not
exceed 50 mm/m (foundation) and 30 mm/m (superstructure members); position
deviation shall not exceed 10 mm (foundation) and 5 mm (superstructure
members).
7.2 Hole Cleaning
Hole cleaning is the key link in planting
quality; incomplete cleaning can reduce the pull-out force by 30%-50%. The
steps are: after drilling, first clean the hole wall with a brush, then blow
out the dust with compressed air; repeat no fewer than 3 times. The acceptance
standard is no dust, no standing water, and no loose concrete debris in the
hole; grouting and planting should be carried out promptly after cleaning, with
an interval preferably not exceeding 30 minutes, to prevent secondary
contamination of the hole wall.
7.3 Grouting and Rebar Insertion
Grouting should start from the hole bottom,
withdrawing the nozzle gradually outward as the adhesive is extruded, to ensure
the hole is full; the grout volume should be about 2/3 of the hole depth. The
rebar should be inserted slowly with rotation so that the adhesive evenly coats
the rebar surface. The rebar must not be disturbed during the curing period
after planting; the curing time shall follow the product manual. At normal
temperature (25 ℃), the curing time shall be no less than 72 h; it should be
extended accordingly in low-temperature environments. On-site anchorage
bearing-capacity inspection may be carried out only after the adhesive has
cured for a full 7 days.
VIII.
Conclusion
Determining the rebar-planting anchorage
depth is a three-step process of 'formula calculation - constructive maximum -
factor correction,' and no step may be omitted:
Step 1: calculate the basic anchorage depth
by l_s = 0.2·α_spt·d·(f_y/f_bd), and take the larger value against the
constructive minimum corresponding to its force type.
Step 2: superimpose the bearing-capacity,
displacement-ductility, and splitting-influence corrections by l_d = ψ_N × ψ_ae
× l_s; seismic zones and cantilever members must be checked separately.
Step 3: review the anchorage depth by
location and force characteristic, and implement the construction-quality
control requirements for hole cleaning, grouting, curing, and pull-out
inspection.
The quick-reference table and location
reference values are for quick on-site estimation only; they shall not replace
structural calculation, and still less shall anchorage depth be back-calculated
from short-term pull-out test values.